IPCCENTER

International Petroleum Consultancy Centre

International Petroleum Consultancy Centre

Course Title: Onsite Well Testing 

Program Objectives: 

Upon completion the candidates will sharpen their knowledge with Well Testing with the rig On
or Off. The Course establishes an understanding of principles and procedures of Well Testing
with the rig on to confirm the integrity of the well during production face and give clear picture
about production future of the well.

Course Outlines:
1. Drill Stem Testing                                                                           2. Dry Test
  1.1 DST assembly                                                                                 2.1 Test assembly
  1.2 DST procedure                                                                              2.2 Test procedure                                                                      1.3 Special safety procedure                                                            2.3 Special safety procedure
 
3. Draw Down Test                                                                             4. Communication Test
  3.1 DST assembly                                                                                4.1 DST assembly
  3.2 DST procedure                                                                             4.2 DST procedure
  3.3 Special safety procedure                                                           4.3 Special safety procedure
5. Injection/PFO TEST                                                                       6. Production Test
  5.1 DST assembly                                                                              6.1 DST assembly
  5.2 DST procedure                                                                            6.2 DST procedure
  5.3 Special safety procedure                                                          6.3 Special safety procedure

This program is designed for:
Drilling Supervisors, Drilling Engineers, Engineers, Rig staff, Casing Crew,
Driller’s tool pushers, Superintendents, Service company personnel, Mud
engineers, rig site geologist
Program Duration: 3 days.